Used Self Erect Cranes Eugene - Generally the base that is bolted into a large concrete pad provides the crucial support for a tower crane. The base is connected to a tower or a mast and stabilizes the crane that is attached to the inside of the building's structure. Normally, this attachment point is to a concrete lift or to an elevator shaft.
Typically, the mast is a triangulated lattice structure measuring 10 feet square or 0.9m2. The slewing unit is connected to the very top of the mast. The slewing unit is made of a gear and a motor which enable the crane to rotate.
Tower cranes are able to have a maximum unsupported height of 80m or two hundred sixty five feet. The maximum lifting capacity of a tower crane is sixteen thousand six hundred forty two kilograms or 39,690 lbs. with counter weights of twenty tons. In addition, two limit switches are used to be able to ensure the operator does not overload the crane. There is even another safety feature called a load moment switch to make sure that the driver does not exceed the ton meter load rating. Lastly, the maximum reach of a tower crane is two hundred thirty feet or seventy meters.
There is certainly a science involved with erecting a tower crane, particularly due to their extreme heights. First, the stationary structure needs to be transported to the construction location by utilizing a big tractor-trailer rig setup. Next, a mobile crane is utilized so as to assemble the equipment part of the jib and the crane. These parts are then connected to the mast. The mobile crane then adds counterweights. Forklifts and crawler cranes can be a few of the other industrial equipment that is commonly utilized to erect a crane.
Mast extensions are added to the crane when the building is erected. This is how the height of the crane can match the building's height. The crane crew uses what is referred to as a climbing frame or a top climber that fits between the slewing unit and the top of the mast. A weight is hung on the jib by the work crew so as to balance the counterweight. When complete, the slewing unit can detach from the top of the mast. In the top climber, hydraulic rams are used to adjust the slewing unit up an additional twenty feet or 6.1m. Next, the operator of the crane uses the crane to insert and bolt into place another mast part piece.